skip to main | skip to sidebar

James Loder Construction Blog

Tuesday, May 15, 2007


These are some working drawings details I did last year that reflect what is happening in my design. The slab, footing with the spider plate and concrete panel. Then the roof sheeting and the UB rafters with the box gutter that I am also using
Posted by Jim at 3:58 AM

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2007 (28)
    • ▼  May (12)
      • ►  May 28 (4)
      • ▼  May 15 (8)
        • Detail Render
        • Rendered Model Stage 2
        • Site Visit - Suspended slabs and Suspended Ceilings
        • These are some working drawings details I did last...
        • Rendered Model - Stage 1
        • These are some wireframe renders of what my final ...
        • Site Visit - Concrete Panel Installation
        • Concrete slab and panel construction
    • ►  April (3)
      • ►  Apr 25 (3)
    • ►  March (11)
      • ►  Mar 21 (1)
      • ►  Mar 13 (3)
      • ►  Mar 07 (7)
    • ►  February (2)
      • ►  Feb 28 (2)

About Me

Jim
View my complete profile