These images show how the formwork for the suspended concrete slab.It is laid onto either metal deck sheeting or timber boards which are all held up by acro props from underneath. The props are removed once the concrete is dry and the formwork is left in position.



These are some photos from the same site showing the installation of the suspended ceiling. The plasterboard is simple attatched to the railes and the insulation sits on top. In my design I will hopefully be able to just attatch the suspended ceiling to the purlins, opposed to this case where its a suspended slab.